Half Sized Blog Element (Single Author Style)

Half Sized Blog Element (Multi Author Style)

Double decker mobile bus bar build continued

So at this stage the upstairs was complete and the down stairs was virtually in place. A few items still to be covered were:

Routemaster mobile bus bar fixtures and fittings!

With the the lines and coolers installed it was time to add all the bits required downstairs to actually operate as a bar. Here is a rough outline of all the bits still to be added.

Double decker mobile bus bar build continued

So at this stage the upstairs was complete and the down stairs was virtually in place. A few items still to be covered were:

Routemaster mobile bus bar fixtures and fittings!

With the the lines and coolers installed it was time to add all the bits required downstairs to actually operate as a bar. Here is a rough outline of all the bits still to be added.